[ Close ]
Username
Password


Forgotten your password?
 
Custom Search
Electrical, Electronics & Communication Projects
 Projects Q A, Guidance for your projects Projects Forum Electrical, Electronics & Communication Projects
Message Icon Topic: need to make the control section of UPS!! Post Reply Post New Topic
Found this useful? Give a +1   Add to Facebook: Add to Facebook
Free Project Downloads
Electronics Project Download
ECE Mini Project Downloads
Robotics Projects Downloads
Wireless Project Downloads
Space Project Downloads
Embedded Project Download
Microcontroller Downloads
Power Harvesting Projects
Project Topics
All Electronics Projects
ECE Project Topics
VLSI Projects List
Microcontroller Projects
DSP Project Topics
Other Electronics Projects
Electrical (EEE) Projects
Project Presentation Tips
How to choose Project Topic
Tips for Final Year Project
Steps for FYP, Mini Project
Preparing a Project Report
Problems faced in Projects
 
Get Free Electronics (ECE) / Electrical (EEE) Project Downloads:

Enter your email address:  

Author Message
arch02
Newbie
Newbie


Joined: 05-Apr-2012
Online Status: Offline
Posts: 0
Quote arch02 Replybullet Topic: need to make the control section of UPS!!
    Posted: 08-Apr-2012 at 9:03pm
hello..!!!
need to make the control section of UPS..!!
helpless...
please help..!!!

 
IP IP Logged
skumar
Senior Member
Senior Member


Joined: 19-Oct-2008
Location: United Kingdom
Online Status: Offline
Posts: 252
Quote skumar Replybullet Posted: 09-Apr-2012 at 10:12pm
Universal control scheme of ASIC



The above figure shows the universal control block diagram of the ASIC (application specific integrated circuit). It contains seven PI-controllers in total. The pulse width modulation generates the signals for six inverter legs. This allows for three independent four-quadrant DC-inverters being used for a three-phase output inverter. The current controllers operate in two modes: for the output inverter three current controllers are used to control the three phases independently. For the rectifier only two controllers are used; the third phase is calculated at the output voltage level. The voltage controllers are only used for output inverter operation. They can be bypassed at the rectifier mode.

Some additional circuitry was included. The measurement of the phase difference for the PLL-control of the line frequency is supported by the ASIC using phase angle captures functions. To support the microcontroller to determine the effective output voltage and current load the integrated squares of the measured values are calculated during a period of the sine wave frequency.

The repetition cycle of all calculations performed by the ASIC is the switching frequency of the inverter legs. This frequency normally amounts to 20 kHz. At the beginning of the cycle the A/D-conversion is started. The ASIC calculates the references and the UD-voltage controller. After at most 15 s the A/D-conversion is ready and the calculation of the controllers starts being performed in 10 s for all six PI-algorithms. New PWM-values are given to the modulator at the middle of the switching cycle. In the remaining second half of the cycle the ASIC performs the calculation of sum of squares of the measured values.

 
IP IP Logged

 
Post Reply Post New Topic

Free Programming Courses in JAVA, .Net and PHP (Register Now!)

Java Free Online Course

.Net Free Online Course

PHP Free Online Course


 
Printable version Printable version

Forum Jump
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot delete your posts in this forum
You cannot edit your posts in this forum
You cannot create polls in this forum
You cannot vote in polls in this forum



This page was generated in 0.031 seconds.
© ProjectsQA.com   |   Privacy policy